Preliminary study
Rapid technical feasibility analysis to validate assumptions before any in-depth study.
Our reports are structured to meet international lender and institutional investor requirements — so your technical file holds up under Lender's Engineer scrutiny.
Feasibility report rejected by the lender because it is not structured to their standards
Unable to raise capital due to lack of credible independent technical study
Rapid technical feasibility analysis to validate assumptions before any in-depth study.
Assessment of the existing network's hosting capacity.
Feasibility report structured to AfDB, World Bank, IFC and MIGA standards.
Assessment of the impact of key assumption variations on technical results.
Independent review on behalf of investors wishing to audit an existing project.
Coordination with the lender's engineer (IFC, AfDB) throughout the financing process.
Gathering of grid data, site plans, weather data and production assumptions.
Completed data matrix
Grid simulation, expected annual production calculation, constraint analysis.
Technical analysis note
Structuring according to lender templates, drafting conclusions and recommendations.
Feasibility report v1
Internal quality review, client comment integration, final version.
Signed final bankable report
Interface with lender questions, report update if necessary.
Facilitated financing agreement
Preliminary study
2-4 weeks
Full report
6-10 weeks
Lender review
4-8 weeks
Tell us about your project and we'll send you a scoping proposal within 72 hours.