Grid Connection
From impact study to technical operator dossier, we work through every step so your grid connection file meets the grid code and clears operator review.
- Load flow and power transit studies
- Network stability analysis
- Connection point qualification
- Technical operator dossier
- Exchange follow-up with network manager
- Grid code compliance